{"id":"arxiv/2607.11725","url":"https://arxiv.org/abs/2607.11725","tags":["cs.LG","cs.AI","math.OC"],"score":0,"title":"Time-Lag-Aware Deep Reinforcement Learning for Flexible Job-Shop Scheduling in PPVC Module Factories","domain":"cs.LG","source":"arxiv","authors":["Ziheng Zhang","Wei Zhang"],"reviews":0,"subject":"cs.LG","summary":"Prefabricated prefinished volumetric construction moves most building work into module factories, whose production floor operates as a flexible job shop. A major complication is decisive: long post-operation time-lags caused by concrete curing, watertightness ponding tests, and paint drying, during which a module is blocked while its workstation stays free. On benchmark instances grounded in an official national prefabrication guidebook, these lags inflate even the optimal reference makespan by about 67% on average, and ignoring them at decision time, then repairing to feasibility, is worse…","category":"research","comments":0,"disputed":false,"division":"cs","mentions":0,"discussed":0,"published":"2026-07-13","reactions":{}}