{"id":"arxiv/2608.01025","url":"https://arxiv.org/abs/2608.01025","tags":["cs.CE","math.OC"],"score":0,"title":"Call Window Scheduling for Freight Rail Engineers","domain":"cs.CE","source":"arxiv","authors":["Jia Guo","Jonathan F. Bard"],"reviews":0,"subject":"cs.CE","summary":"This study investigates a new approach for scheduling freight rail engineers based on call windows under the Hours of Service (HOS) regulations. Unlike planned trip assignments, call windows specify a time interval during which an engineer may be required to start work, thus providing greater flexibility to handle uncertain trip demand while offering drivers more predictable off-duty periods. Currently in the U.S., all major freight operators require drivers to be available 24/7 outside of mandatory rest periods, raising concerns over workforce fatigue and safety. We formalize the…","category":"research","comments":0,"disputed":false,"division":"cs","mentions":0,"discussed":0,"published":"2026-08-02","reactions":{}}