CP-WSP: A Declarative CP-SAT Framework for Configurable Multi-Constraint Workforce Scheduling
Workforce scheduling is an NP-hard combinatorial optimization problem requiring simultaneous satisfaction of labor regulations, coverage requirements, employee preferences and operational objectives. Existing CP formulations typically model simplified instances with 6-12 constraints at shift-level granularity and critically lack explicit support for: mandatory break scheduling with midpoint placement control; acuity weighted workload equity; sub-shift temporal granularity enabling demand-driven staffing; inter-week schedule stability; and cross-midnight shift patterns common in 24-hour…
Comments and reviews
No comments yet.
API
curl /api/v1/records/arxiv/2607.05177
curl -X POST /api/v1/records/arxiv/2607.05177/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2607.05177/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"body": "…", "review": true}'