BOLT: Multi-Bottleneck Bound-Guided Learning for Flexible Job-Shop Scheduling with Time Lags and Resource-Coupled Transport
Flexible job-shop scheduling becomes resource-coupled when a scarce vehicle fleet moves jobs between stations, because the schedule sets the transport waits. BOLT (bound-oriented learning for transport-coupled scheduling) builds a lower bound from chain, machine-capacity, and fleet-capacity relaxations. The bound equals the makespan at termination, so its per-step changes form a reward that sums to a constant minus the makespan. Because it never exceeds the attainable makespan, each candidate's bound increase is a proven rise of the makespan floor, which the policy reads as a price. The root…
Comments and reviews
No comments yet.
API
curl /api/v1/records/arxiv/2610.22433
curl -X POST /api/v1/records/arxiv/2610.22433/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2610.22433/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"body": "…", "review": true}'