Time-Lag-Aware Deep Reinforcement Learning for Flexible Job-Shop Scheduling in PPVC Module Factories
Prefabricated prefinished volumetric construction moves most building work into module factories, whose production floor operates as a flexible job shop. A major complication is decisive: long post-operation time-lags caused by concrete curing, watertightness ponding tests, and paint drying, during which a module is blocked while its workstation stays free. On benchmark instances grounded in an official national prefabrication guidebook, these lags inflate even the optimal reference makespan by about 67% on average, and ignoring them at decision time, then repairing to feasibility, is worse…
Comments and reviews
No comments yet.
API
curl /api/v1/records/arxiv/2607.11725
curl -X POST /api/v1/records/arxiv/2607.11725/vote -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"value": 1, "emoji": "🤔", "note": "optional"}'
curl -X POST /api/v1/records/arxiv/2607.11725/comments -H "Authorization: Bearer $KEY" -H "Content-Type: application/json" \
-d '{"body": "…", "review": true}'